contractor in a sentence

500 English sentence(s)

Last Updated: 2026-06-09

Level:

The contractor will plumb up the water softener system.

The contractor will pave the crawl space to prevent any soil erosion underneath the house.

The contractor evaluated the solidities of the soil before laying the foundation.

The contractor used backfills to stabilize the soil before building the retaining wall.

The contractor used a backfill material to stabilize the soil before building the retaining wall.

The contractor recommended a slab on grade foundation for the project due to the soil conditions.

The contractor holds a license to install solar panels.

The contractor suggested we install the solar panels on top of the roof.

The repossessed construction equipment was sold to a contractor.

The company found a solution to the problem of a leaky roof by hiring a professional contractor.

The contractor applied a layer of cement onto plastic sheets to create a durable flooring solution.

The contractor had to slap together a temporary fix until the permanent solution could be implemented.

Handymen can be a cost-effective solution for minor home repairs, but for more complex projects, it may be worth investing in a professional contractor.

I need some advise for finding a reliable contractor for home renovations.

I'm looking for a reliable contractor to do some electrical work in my kitchen.

The dodgy contractor didn't follow through on his promises, so we had to find someone else.

The dodgy contractor didn't follow through on his promises, so we had to hire someone else.

The homeowner made a claim against the contractor for not finishing the job, so they had to hire someone else.

After missing several deadlines, the contractor forfeited the project, and the client had to find someone else to complete the work.

Since the contractor failed to complete the work on time, I had to hire someone else to finish the job, and I am hoping the original contractor will reimburse me for the additional costs.

The buyer's father, who was a contractor, came to inspect upstairs with his son.

The buyer's father, who was a contractor, found an issue while inspecting upstairs with his son.

As soon as the contractor finishes the project, the client will release the final payment.

The contractor refused liability for the delay in completing the project, but they promised to finish it soon.

As soon as the client approves the final draft of the contract, the contractor will begin work on the project.

If we don't contract back with the contractor soon, we may miss our deadline for completing the construction project.

As soon as the contractor finished the renovation work, the homeowner was expected to pay up the final installment of the contract, which included all the labor and materials used.

The family decided to renovate the house, and they hired a contractor to do the work, but they soon realized that the project would take longer than expected and cost more than they had budgeted.

The contractor submitted a counteroffer on the project timeline, but the client wanted it completed sooner.

The contractor sought to shift liability to the homeowner.

The investigative journalist sought to subpoena with the government contractor.

The goodman's expertise in carpentry made him a sought-after contractor in the area.

The government agency sought to transfer liability for the project to a private contractor.

The exactor's reputation for reliability and efficiency made him a sought-after contractor.

The government agency sought to transfer liability to the contractor for any project delays.

The government agency sought to transfer liability to the contractor for any environmental damages.

The contractor sought approval from the homeowner before making any changes to the renovation plans.

The homeowner hired a contractor to help them regain soundness in their home's foundation.

The contractor is installing a soundproof pane for the recording studio.

The contractor will be responsible for sourcing and installing a porch chandelier.

The company hired a contractor to remodel their office space.

The contractor used gypsum board to create a partition wall in the office space.

The contractor will brick up the old patio and create a new outdoor living space.

The contractor will renovate beneath the stairs to create additional storage space.

We hired a turn-key contractor to handle all the renovations for our new office space.

When the balusters were installed, the contractor made sure they were spaced evenly and securely fastened to the railing.

The contractor recommended using a baluster spacing calculator to ensure safety compliance.

The homeowner hired a contractor to refurbish their outdated kitchen and design a more open and spacious layout.

The contractor ordered spare lumber in case of mistakes during construction.

The homeowner asked to speak to the contractor about a home renovation project.

How useful was this page?
4.8 of 5 (92 votes)